The connection between Cornaviin and the industrial zone of Meyrin, zimeysa, is overloaded and crowded. This overbooking provides delay in the connection in Cornavin,. It would be important to change the size of the train RL5 to a longer train, in order to ensure ab on-boarding on time. Each station has a high volume of passengers who needs to connect with the IC Train to Lausanne or Neuchâtel. During the last 4 weeks, i missed the connection 12 times over 20, which is increasing my transportation time by more than 30 minutes.
Thanks for your continuous effort.
Best regards