Hello RingoG
Zermatt - Täsch - Zermatt, 24.10 - 20.11.2022, adjusted timetable
Due to construction work, all trains between Zermatt and Täsch will run according to a slightly adjusted special timetable. Departures always xx.45 / xx.08 /xx.28. The timetable at sbb-tickets.cc/en has been adjusted.
Visp - Täsch - Visp, 24.10 - 20.11.2022, bus replacement
Due to construction work, buses with disabled acces will run instead of the train (no WC / very limited bicycle transport). These run according to the timetable. sbb-tickets.cc/en
You can directly buy train tickets from Visp - Zermatt in November 2022 (2 month before) on the website from the Matterhorn Gotthard Bahn:
https://www.matterhorngotthardbahn.ch/en/summer/
Kind regards
Alban